कैलेंडर प्रिंट करें 2014
Create custom printable calendars with your preferred design and settings
2014 is a common year of 365 days, so February runs to 28. It opens and closes on a Wednesday, which is what a 365-day year does. Counted the ISO way it holds 52 weeks, beginning on December 30. Everything below is calculated for 2014 specifically, and every layout on this page prints from the generator above.
About the 2014 calendar
There is no February 29 in 2014. A common year is exactly 52 weeks and one day long, which is why the year ends on the same weekday it began, and why every date in 2015 lands one weekday later than it does in 2014. Set against its neighbors, 2014 sits one weekday on from 2013 and one weekday short of 2015. 2013 started on a Tuesday, 2014 starts on a Wednesday, and 2015 starts on a Thursday. If you want the arithmetic behind that, how many days are in a year covers it.
2014 carries the ordinary 52 ISO weeks. Week 1 is the week containing January 4, so the first days of January can still belong to the last week of 2013, depending on where they fall. Two months in 2014 spill into a sixth row on a Monday-start grid: March and June. That is where day cells get shortest on a monthly layout. Switch the week start to Sunday and the six-row months become March, August, and November instead, so the setting genuinely changes what prints. 261 days fall Monday to Friday and 104 at the weekend, before any public holiday comes off. See how ISO week numbers work if the numbering matters for your work.
The movable dates are the ones to check before printing anything: Easter Sunday falls on April 20, with Good Friday on April 18, Mother's Day on May 11, US Thanksgiving on November 27, Chinese New Year on January 31, Eid al-Fitr around July 27. Fixed dates do not move, but the weekday under them does. In 2014, Christmas Day is a Thursday, July 4th a Friday, Halloween a Friday. Turning on holiday marking in the settings puts your own country's public days on the sheet instead of a generic list.
2014 has a single Friday the 13th, in June. August is that rare kind of month with five Fridays, five Saturdays and five Sundays, which only happens to a 31-day month opening on a Friday. And because the Gregorian calendar repeats, 2014 is grid-for-grid identical to 2003: same weekdays, same dates, same month layouts. A 2014 sheet will be right again in 2025. Only the dates that move, Easter and the lunar holidays, need checking again.
2014 holds twelve full moons, the first on January 16 and the last on December 6. The lunar month does not divide into the calendar year, which is why the moon dates shift even between years whose grids are identical, and why a moon phase calendar has to be generated for the year rather than reused.
Set the year, week start, paper size and colors in the generator above, then print directly or download the 2014 PDF.
2014 calendar questions
- Is 2014 a leap year?
- No. 2014 is a common year: February has 28 days and the year runs to 365. The nearest leap years either side are 2012 and 2016.
- How many weeks are in 2014?
- 52 by the ISO-8601 count, starting on December 30. In days that is 365, or 52 weeks and one spare day. Those spare days are why the weekday of a given date moves every year.
- What day of the week does 2014 start on?
- January 1 is a Wednesday, and December 31 is a Wednesday. Printed with the week starting on Monday, January shows two blank cells before the 1st. With a Sunday start, three.
- Can I reuse an old calendar for 2014?
- Yes, if it is from 2003. That year has the same weekday pattern and the same common-year length, so every date lands on the same day. The next year a 2014 calendar will be right again is 2025. Only the holidays that move need re-checking, which means Easter and the lunar dates.
- How many working days does 2014 have?
- 261 days fall Monday to Friday, and 104 at the weekend. Public holidays come off that 261 and differ by country, so switch holiday marking on and pick your country before you count out a contract or a notice period.
- How many full moons are there in 2014?
- Twelve. The first is January 16 and the last December 6. No month holds two, so there is no blue moon this year. The moon phase calendar marks all four principal phases on the dates they fall.
- Which 2014 layout should I print?
- The yearly sheet puts all twelve months on one sheet for a wall. The monthly layout gives each month a full page and room to write in. The weekly pages suit time blocking. All of them print at A4 and US Letter, and the calendar types guide compares the rest.