PrintAnyCalendar

कैलेंडर प्रिंट करें 2001

Create custom printable calendars with your preferred design and settings

2001 is a common year of 365 days, so February runs to 28. It opens and closes on a Monday, which is what a 365-day year does. Counted the ISO way it holds 52 weeks, beginning on January 1. Everything below is calculated for 2001 specifically, and every layout on this page prints from the generator above.

About the 2001 calendar

There is no February 29 in 2001. A common year is exactly 52 weeks and one day long, which is why the year ends on the same weekday it began, and why every date in 2002 lands one weekday later than it does in 2001. Set against its neighbors, 2001 sits two weekdays on from 2000 and one weekday short of 2002. 2000 started on a Saturday, 2001 starts on a Monday, and 2002 starts on a Tuesday. If you want the arithmetic behind that, how many days are in a year covers it.

2001 carries the ordinary 52 ISO weeks. Week 1 is the week containing January 4, so the first days of January can still belong to the last week of 2000, depending on where they fall. Three months in 2001 spill into a sixth row on a Monday-start grid: April, July, and December. That is where day cells get shortest on a monthly layout. Switch the week start to Sunday and the six-row months become September and December instead, so the setting genuinely changes what prints. 261 days fall Monday to Friday and 104 at the weekend, before any public holiday comes off. See how ISO week numbers work if the numbering matters for your work.

The movable dates are the ones to check before printing anything: Easter Sunday falls on April 15, with Good Friday on April 13, Mother's Day on May 13, US Thanksgiving on November 22, Chinese New Year on January 24, Eid al-Fitr around December 15. Fixed dates do not move, but the weekday under them does. In 2001, Christmas Day is a Tuesday, July 4th a Wednesday, Halloween a Wednesday. Turning on holiday marking in the settings puts your own country's public days on the sheet instead of a generic list.

2001 has two Fridays falling on the 13th, in April and July. No month in 2001 manages five Fridays, five Saturdays and five Sundays, though September and December do carry five full Saturday-and-Sunday weekends. And because the Gregorian calendar repeats, 2001 is grid-for-grid identical to 1990: same weekdays, same dates, same month layouts. A 2001 sheet will be right again in 2007. Only the dates that move, Easter and the lunar holidays, need checking again.

2001 holds 13 full moons, the first on January 10 and the last on December 31. Two of them fall in the same month, so December carries a blue moon. The lunar month does not divide into the calendar year, which is why the moon dates shift even between years whose grids are identical, and why a moon phase calendar has to be generated for the year rather than reused.

Set the year, week start, paper size and colors in the generator above, then print directly or download the 2001 PDF.

2001 calendar questions

Is 2001 a leap year?
No. 2001 is a common year: February has 28 days and the year runs to 365. The nearest leap years either side are 2000 and 2004.
How many weeks are in 2001?
52 by the ISO-8601 count, starting on January 1. In days that is 365, or 52 weeks and one spare day. Those spare days are why the weekday of a given date moves every year.
What day of the week does 2001 start on?
January 1 is a Monday, and December 31 is a Monday. Printed with the week starting on Monday, January shows no blank cells before the 1st. With a Sunday start, one.
Can I reuse an old calendar for 2001?
Yes, if it is from 1990. That year has the same weekday pattern and the same common-year length, so every date lands on the same day. The next year a 2001 calendar will be right again is 2007. Only the holidays that move need re-checking, which means Easter and the lunar dates.
How many working days does 2001 have?
261 days fall Monday to Friday, and 104 at the weekend. Public holidays come off that 261 and differ by country, so switch holiday marking on and pick your country before you count out a contract or a notice period.
How many full moons are there in 2001?
13. The first is January 10 and the last December 31. December holds two of them, which is where the phrase blue moon comes from. The moon phase calendar marks all four principal phases on the dates they fall.
Which 2001 layout should I print?
The yearly sheet puts all twelve months on one sheet for a wall. The monthly layout gives each month a full page and room to write in. The weekly pages suit time blocking. All of them print at A4 and US Letter, and the calendar types guide compares the rest.