PrintAnyCalendar

Cetak Kalender 2004

Create custom printable calendars with your preferred design and settings

2004 is a leap year: 366 days, with 29 of them in February. It opens on a Thursday and closes on a Friday, because the extra day pushes the end of the year one weekday past the start. Counted the ISO way it holds 53 weeks rather than the usual 52, and week 1 begins on December 29. Everything below is calculated for 2004 specifically, and every layout on this page prints from the generator above.

About the 2004 calendar

The leap day lands on Sunday, February 29. That single extra day is why 2004 does not end on the weekday it started on, and why a wall calendar printed for any other year goes wrong from the end of February onwards. Set against its neighbors, 2004 sits one weekday on from 2003 and two weekdays short of 2005. 2003 started on a Wednesday, 2004 starts on a Thursday, and 2005 starts on a Saturday. If you want the arithmetic behind that, how many days are in a year covers it.

2004 is one of the years carrying a 53rd ISO week, which comes round roughly every five or six years. Anything counted in weeks gains a period: payroll runs, sprint numbers, school terms. A template built for 52 will come up one short in December. Two months in 2004 spill into a sixth row on a Monday-start grid: May and August. That is where day cells get shortest on a monthly layout. Switch the week start to Sunday and the six-row months become May and October instead, so the setting genuinely changes what prints. 262 days fall Monday to Friday and 104 at the weekend, before any public holiday comes off. See how ISO week numbers work if the numbering matters for your work.

The movable dates are the ones to check before printing anything: Easter Sunday falls on April 11, with Good Friday on April 9, Mother's Day on May 9, US Thanksgiving on November 25, Chinese New Year on January 22, Eid al-Fitr around November 13. Fixed dates do not move, but the weekday under them does. In 2004, Christmas Day is a Saturday, July 4th a Sunday, Halloween a Sunday. Christmas falling at the weekend is worth knowing early, because most countries move the public holiday to the Monday or Tuesday after it. Turning on holiday marking in the settings puts your own country's public days on the sheet instead of a generic list.

2004 has two Fridays falling on the 13th, in February and August. October is that rare kind of month with five Fridays, five Saturdays and five Sundays, which only happens to a 31-day month opening on a Friday. And because the Gregorian calendar repeats, 2004 is grid-for-grid identical to 1976: same weekdays, same dates, same month layouts. A 2004 sheet will be right again in 2032. Only the dates that move, Easter and the lunar holidays, need checking again.

2004 holds 13 full moons, the first on January 8 and the last on December 27. Two of them fall in the same month, so August carries a blue moon. The lunar month does not divide into the calendar year, which is why the moon dates shift even between years whose grids are identical, and why a moon phase calendar has to be generated for the year rather than reused.

Set the year, week start, paper size and colors in the generator above, then print directly or download the 2004 PDF.

2004 calendar questions

Is 2004 a leap year?
Yes. 2004 divides by four and is not a skipped century year, so February has 29 days and the year runs to 366. The leap day is Sunday, February 29.
How many weeks are in 2004?
53 by the ISO-8601 count, which is the one payroll and project software normally use. Week 1 starts on December 29 and week 53 runs to the end of the year. Counted loosely, 366 days is 52 weeks and two days.
What day of the week does 2004 start on?
January 1 is a Thursday, and December 31 is a Friday. Printed with the week starting on Monday, January shows three blank cells before the 1st. With a Sunday start, four.
Can I reuse an old calendar for 2004?
Yes, if it is from 1976. That year has the same weekday pattern and the same leap-year length, so every date lands on the same day. The next year a 2004 calendar will be right again is 2032. Only the holidays that move need re-checking, which means Easter and the lunar dates.
How many working days does 2004 have?
262 days fall Monday to Friday, and 104 at the weekend. Public holidays come off that 262 and differ by country, so switch holiday marking on and pick your country before you count out a contract or a notice period.
How many full moons are there in 2004?
13. The first is January 8 and the last December 27. August holds two of them, which is where the phrase blue moon comes from. The moon phase calendar marks all four principal phases on the dates they fall.
Which 2004 layout should I print?
The yearly sheet puts all twelve months on one sheet for a wall. The monthly layout gives each month a full page and room to write in. The weekly pages suit time blocking. All of them print at A4 and US Letter, and the calendar types guide compares the rest.